The group has taken portion in the producing and revising of ISO/TC100 international chain common several many years in accomplishment and hosted the sixteenth ISO/TC100 Intercontinental once-a-year conference in 2004. EPG is a specialist company and exporter that is anxious with the design and style, growth and generation. Each approach, every single part, every function in EPG is demanded to be done one stage following one more, very carefully and cautiously, from material assortment, reformation to manufacturing accessories, from elements warmth treatment method to automatic assembly, from quality control to item inspection and testing and from order dealing to soon after product sales services. Product Introduction
JIC Woman forty five Diploma EPT JCEP Stainless Metal EPT JCEP/Coupling 26711
EPTnical Assist
QC EPTs engineering has the capacity to layout drawings conform to SAE, BS, JIS, DIN amp ISO specs.
Merchandise Descriptions
one. Swaged American JCEPs
NPT EPT JCEPs
NPT EPT Swivel JCEPs
NPEPT sixty deg Cone Seal JCEPs
JIC EPT 74 deg Cone JCEPs
JIC Woman seventy four deg Cone Seat JCEPs
SAE Female ninety deg Cone Seat JCEPs
ORFS EPT O-Ring Seal JCEPs
ORFS Female Flat Seat JCEPs
SAE Flange JCEPs
2. Swaged British JCEPs
BSPT EPT JCEPs
BSPP EPT sixty deg Cone Seat JCEPs
BSPP Female sixty deg Flat Seat JCEPs
BSPP Woman sixty deg Cone Seal JCEPs
BSPP Feminine Multiseal JCEPs
3. Swaged Metric JCEPs
Metric Female Flat Seat JCEPs
Metric Feminine Multiseal JCEPs
Metric Female 24 deg Cone O-Ring L.T. JCEPs
Metric Female 24 deg Cone O-Ring H.T. JCEPs
Metric Woman 60 deg Cone Seat JCEPs
Metric Feminine 74 deg Cone Seat JCEPs
Metric Standpipe JCEPs
JIS Metric Feminine 60 Cone Seat JCEPs
4. Ferrules
00110 for SAE 100R1AT /EN 853 1SN EPT
00110-A for SAE 100R1AT /EN 853 1SN EPT
5710 for SAE 100R2AT /EN 853 2SN EPT
05710 for SAE 100R2AT /EN 853 2SN EPT
03300 for SAE 100R 1AT
03310 for SAE 100R 1AT, 2AT
00400 for 4SP, 4SH/10-16, R12/06-sixteen EPT
00401 for 4SH, R12/32 EPT
00018 for SAE 100R7/R8 EPT
00TF0 for Teflon EPT
Related Sizzling Sell JCEPs
Manufacturing Method
EPTT and EPT
Our Certification
QC EPTs has been granted ISO 9001:2015 amp SGS certificates for processing stainless steel hydrualic hose fittings and adapters.
Why Decide on Us?
one. Heritage:
QC EPTs is an ISO 9001:2015 licensed manufacturer with over twenty year’s manufacturing knowledge, EPTTizing in EPT hose fittings and adapters. We only target on stainless steel substance, no carbon steel or brass.
two. EPTT EPTT Of Uncooked EPT:
1. We only decide on the greatest high quality stainless steel raw substance. And steel suppliers give materials check certificates for each cargo.
2. We a hundred% measure the sizes of bar stock and forging blanks by callipers for every shipment.
three. We use the Transportable XRF Analyser to check the important chemical aspects of bar stock and forging blanks with ten% for every shipment(Important chemical aspects incEPTT Cr, Ni, Mo, these chemical components are really EPTTant for the corrosion overall performance)
4. Aside from, we randomly choose up several of reducing items to do further chemical evaluation by spectrograph every single 10 daEPTTto make confident the uncooked material 100% competent.
three. EPTT EPTT Of Generation Method:
one. We are using Sigma EPT-EPT CNC Lathe EPTTs to manufacture stainless metal hose fittings and adapters.
The functions of CNC Lathe EPTTs:
1). Twin-aXiHu (West EPT) Dis.s, EPT method
two). Thread reducing resources: EPT Japan, vargus amp carmex Israel(Have a very stable efficiency for the duration of machining)
two. We use callipers to evaluate the basic sizes. And we use the thread gages to inspect the threads.
three. We use Contracer amp Contour Measuring EPTTs to examine the extremely little angles and diameters.
four. Inspection:
one. Initial Write-up Inspection For the duration of Approach
1). The operator make the very first report according to producing drawings.
two). The operator will examine the very first write-up and file. If the sizes and threads fulfill the manufacturing drawings, and then the initial report will be set in a EPTT box( the box is for first post only).
three). Workshop foreman will take second inspection for the initial write-up.
four). Only passing the inspection by workshop foreman, and then start with mass generation.
2. Mass Manufacturing Right after Very first Post Inspection
one). Right after the 1st article accredited by operator and workshop foreman, and then begin with mass creation.
two). For the duration of mass generation, the operator needs to examine the threads every single 10 parts, and measure the sizes each fifteen items. When any fittings of threads and dimensions out of the specs, all this batch of fittings will be inspected completely.
three). The competent fittings will be fitly set in a plastic box piece by piece.
four). Lastly, the concluded fittings will be transported to inspection section for final inspection.
3. Closing Inspection
1). Look: one hundred% inspection unEPTTstrong mild. No scratch, No burr.
two). Key sizes and angles: fifteen-20% randomly inspection by callipers and contracer. When any dimensions and angles of fittings out of specs or does not regard to drawings, this batch of fittings will be compelled to return again to production workshop to enhance or make a new substitute.
3). Threads: fifteen-20% randomly inspection by rigEPTT gages. Once any threads out of specs or does not regard to drawings, this batch of fittings will be forced to return back to production workshop to boost or make a new replacement.
five. Following Provider:
When consumers have any grievances about our products, we will just take a quick motion.
We can 100% make a new substitution for free when the shopper has a grievance about our products.
Our EPTT
FAQ
Q: Are you a trading organization or company?
A: We are a 100% maker, major merchandise cover stainless metal EPT hose fittings and stainless metal EPT adapters.
Q: Do you have stock?
A: Presently we manufactured to get, but we do have some shares for widespread variety uncooked components. So we can make a swift motion for some urgent orders.
Q: Do you have a MOQ request?
A: Typically our MOQ is 200 items. But for some bigger measurements, fifty or one hundred pieces is also satisfactory for the 1st order.
Q: How about your payment approach?
A: thirty% deposit in EPT, the equilibrium payment from the copy of Bill of lading. Of program, I feel every little thing is negotiable.
Q: What about your delivery time?
A: About forty five daEPTTfor common orders. But it is dependent on the orEPTTvolume. Of training course, if you have an urgent purchase, we will attempt best to meet up with you.